worldinoutRegisterLogin | Set Homepage | Save desktop | Mobile | Qr code
Member
OQHL Hydro Engineering Co.,Ltd.
Francis Hydro Turbine;Pelton Hydro Turbine;Kaplan Hydro Turbine
 
Your current location:Home » Sell » Hydro Turbine Governor / PLC Speed governor with Hydro turbine for hydropower...

Hydro Turbine Governor / PLC Speed governor with Hydro turbine for hydropower station

Click image to view full size image
Title: Hydro Turbine Governor / PLC Speed governor with Hydro turbine for hydropower station 
Brand: -
Model: -
Unit price: Negotiable
MOQ: -0 -
Quantity: Negotiable
Delivery date: Since the payment date Days delivery

Contact: Mak (Ms.)    
Mobile:
Telephone:

  Inquiry
Details

 Hydro Turbine PLC Speed Governor for hydropower station

 

Descrition:

This series of PLC governor are suitable to various medium and small turbine generator sets. It is produced according to standards of GB/T9652.1-1997.

This governor designed upon advanced hydraulic technology and PLC control technology, achieve the hydro turbine automatic regulation and control.

 Function: Regulate the turbine speed, Adjust the frequency of generator set, track the frequency of power supply network and control phase. Safety protection in case of emergent stop.

 

Applications:

This PLC governor have two series: GYT Type which control the reaction turbine, like francis turbine , Kaplan Turbine etc.

CJWT type can control the impulse turbine, such pelton turbine, turgo turbine.

This PLC governor used to regulate and control the hydro turbine speed, steady the generator frequency at 50HZ or 60HZ.

The governor can operate in full automatic control or manual field/ remote control.

 

Specifications:

 

PLC governor for hydro turbine generator unit.

 

l         PLC governor for hydro turbine generator unit                         

l         Capacity:     3, 000 /75, 000 Nm                       

l         Power supply:   AC380V, 220V;DC220V, 110V

l         Operating oil pressure: 2.5/4.0/6.4Mpa                           

l         Range of adjustment for opening/closing time: 2.5 - 40s

l         PIDRegulator Parameter Setting Range:                                        

l         Proportional gain Kp:                             0.5 - 20                                      
Hydro Turbine Governor / PLC Speed governor with Hydro turbine for hydropower station

Inquiry
Sell
  • No Category
New Login
Company QR code
Anytime Anywhere Mobile